Overview
Township Road 250 is proposed to be realigned at Conrich Road, as identified in the Conrich Area Structure Plan, in order to redirect heavy and construction traffic away from developing residential areas.
Timeline
- Concept
2024
- Design
Q2 2025
- Construction
TBD
Changed