At the July 8, 2025, meeting, Council approved the terms of reference for a developer led and developer funded area structure plan (ASP) to be called “Wild Rose Power Hub Area Structure Plan”. The objective of the ASP is to outline the land use and servicing policies for the site, which would be primarily developed as a data centre.
The site is located approximately 10 kilometres (6.21 miles) east of the city of Calgary limits, and approximately 2 kilometres (1.24 miles) southwest of the Hamlet of Langdon. The subject site is along Township Road 232 and 1.6 kilometres (1 mile) east of Highway 797. The extent of the area covers three quarter sections, measuring approximately 194 hectares (479 acres) in area and legally described as:
- SW-09-23-27W04;
- SE-09-23-27W04; and
- NE-09-23-27W04.

Project Timeline
Project Initiation
July - September 2025
- Draft the background summary report
- Prepare the public engagement strategy
- Draft the project workplan
Creation of Draft ASP
September - November 2025
- Draft the ASP document
- Land use concept
- Initial reviews
Public Engagement
December 2025 - February 2026
- Circulation of application
- Conduct public engagement
- Complete technical studies
Refinement and Approval
February - April 2026
- Finalize draft
- Public hearing and ASP adoption
Get Involved