East Highway 1 Area Structure Plan

Contents


Latest News

Recent and upcoming milestones for the East Highway 1 ASP project include:

  • On July 27, 2021, Council held a Public Hearing to consider the proposed East Highway 1 Area Structure Plan. Following the hearing, a motion was passed:

    MOVED by Councillor Schule that Bylaw C-8174-2021 be tabled and the applicant directed to work with the three neighbours to create a Joint Planning Area and to formulate a funding formula and revenue sharing plan.

    The video recording and minutes of the Public Hearing are available on the Meetings and Hearings page. This project page will be updated accordingly as is information received.
  • Virtual public information session held on May 6, 2021
  • First reading of the Bylaw April 27, 2021 Council Meeting

Documents

The Draft Plan, technical studies, and FAQs to support the proposed Area Structure Plan are available below:


Background

On July 14, 2020 Rocky View County Council approved a Terms of Reference for an applicant-led Area Structure Plan for the East Highway 1 area. The Highway 1 East Developer Group, a landowner group within the plan area, is leading the Area Structure Plan and have retained additional consultant services to assist in the preparation of the plan. Once drafted, the plan will be presented to Council for consideration.

The East Highway 1 Area Structure Plan includes approximately 1,558 hectares (3,850 acres) of land in southeast Rocky View County. The study area is located immediately south of Highway 1, between Highway 791 and the border with Wheatland County. A portion of the plan falls within the Rocky View County / Wheatland County Intermunicipal Development Plan study area and will eventually be within the Intermunicipal Development Plan area when adopted.

This plan will outline future land use, development phasing, transportation, environmental protection, emergency services, general design, and utility service requirements, to guide the community to accommodate future industrial and business growth in an environmentally and fiscally sustainable manner.


Project Timeline

The East Highway 1 Area Structure Plan will involve public and stakeholder engagement, technical reviews, policy writing, and development of land use scenarios for the area. The plan will be prepared in the following phases:

  • Phase 1: Site Analysis & Concept Development
    Q4 – 2020
    This phase will begin with assessment of the site, technical reporting of the existing site conditions (e.g. transportation, biophysical, historical) and a servicing analysis (water, waste water & storm water). Stakeholderengagement will focus on outreach to the City of Chestermere, Wheatland County, nearby landowners and provincial agencies. Following completion of the technical studies, the team will create draft land use scenarios to inform the draft Area Structure Plan. Public engagement on the draft land use scenarios will take place within the current Provincial Covid-19 guidelines.
  • Phase 2: Review and Consultation
    Q1 – 2021
    The draft Area Structure Plan will be created based on feedback received during Phase 1 from all stakeholders and the technical studies. The draft plan will then be refined as needed through a thorough review process with County departments and further engagement with stakeholders. The current Provincial COVID-19 guidelines will be followed to ensure engagement is meaningful and safe.
  • Phase 3: Presentation and Public Hearing
    Q2 – 2021
    The plan will be presented to Council for consideration of First Reading. This would not be a Public Hearing. If passed, the plan would proceed to Public Hearing and Second Reading. This would be the final opportunity for public input. Upon approval by Council, the Area Structure Plan would then be reviewed by the Calgary Metropolitan Region Board and evaluated against the regional growth policies. Following approval at this stage, the plan would return to Council for Third and Final Reading. This is when the plan would be adopted by Council.


Get Involved

The landowner’s group has retained MVH Urban Planning + Design to facilitate the public engagement for the East Highway 1 Area Structure Plan.

Future opportunities for engagement on this project will be forthcoming. Please sign-up below to receive project updates and notifications of engagement events.

Due to COVID-19 and the need for physical distancing, public engagement on this project may be mainly focused online to ensure the safety of everyone involved. In-person events may only be held if appropriate COVID-19 precautions can be followed.

If you have any questions about the project, please email Benazir Valencia at bvalencia@rockyview.ca or phone 403- 230-1401.

Sign-up below to receive project updates and learn about future opportunities to participate.





           


FOIP Notification: Personal information provided through this online form and submitted via email is collected in accordance with section 33(c) of the Alberta Freedom of Information and Protection of Privacy Act. Information received via the online form is collected for the purpose of creating and maintaining a mailing list to provide interested parties updates on the status of this project. Information received via email may be shared with MVH Urban Planning + Design, the consultant leading the public engagement phase of the project. Questions about the collection, use, and disclosure of this information can be directed to the Manager of Planning & Development Services at 403-230-1401.

Contact

Planning Policy
403.230.1401
Planning_Policy@rockyview.ca

County Plans Overview

Check out the County Plans Overview (PDF) for a quick look at the different types of planning documents used in the County and how they interact.