Overview
Bridge File 13544 carries Rge Rd 260 over the Rosebud River, north of Twp Rd 273. The existing structure is a 30 metre, 3-span pony truss bridge, which was built in 1926 and has reached the end of its service life.
Project Timeline
Engineering and construction are planned for 2024. Construction schedule to be confirmed once a contract has been awarded.
Should you have any questions or require additional information, please contact Eric Schuh, Project Manager at 403-230-1401, or eschuh@rockyview.ca.