Overview
Bridge File 13177 carries Twp Rd 264 over a tributary to Crossfield Creek, west of Rge Rd 275. The existing structure is a single 16.4 metre long, 2147mm x 1575mm structural plate corrugated steel arch pipe culvert, which was built in 1986 and has reached the end of its service life.
Project Timeline
Engineering and construction are planned for 2024. Construction schedule to be confirmed once a contract has been awarded.
Should you have any questions or require additional information, please contact Eric Schuh, Project Manager at 403-230-1401, or eschuh@rockyview.ca.